
HOW IT WORKS
PLC signals and video —
combined into one operational record.
1
PLC INTEGRATION
Machine state and cycle data
Downtime events, cycle deviations, and machine states from PLC — matched in real time with visual evidence from the exact moment they occurred.
2
VISION LAYER
What the sensors don't log
Camera captures what PLC signals miss — component misalignment, operator intervention, upstream causes, and the real sequence of events behind every stoppage.
WHAT YOU GET
Real-time OEE tracking — availability, performance, and quality in one view
PLC and video-based downtime categorisation — automatic, not manual
AI root-cause analysis — visual evidence mapped to every stoppage event
Correlation analysis between stations — upstream causes of downstream losses
Anomaly detection — deviations flagged before they become failures
DEPLOYMENT
2–4 weeks from camera installation to live OEE and downtime insights
INTEGRATION
Connects to existing PLC, MES, and ERP — no replacement required
PRIVACY
Edge-processed on-site, anonymised, full cybersecurity compliance
SCALE
Single automated line to multi-site enterprise rollouts
PAYBACK
Typically under 12 months based on current deployments
more solutions
Works across every production environment.
Our Solutions
Almetra is the intelligence layer for your factory — it turns what happens on the floor into real-time answers and measurable improvement.
Manual
Automated
Lines
Stations
See what's actually causing downtime
on your automated line.
Request a demo or start with a factory assessment. Most teams see their first real-time OEE and root-cause insights within two weeks of deployment.
Questions
answered.
What is Almetra and how is it different from a camera or video analytics system?
What kinds of factories and production environments does Almetra work in?
How long does deployment take — and what does implementation look like?
How does Almetra handle data privacy and worker concerns?
Does Almetra replace our existing MES, ERP, or PLC systems?
What outcomes can we realistically expect — and how quickly?
Is Almetra only useful for improving existing lines — or can it help with new products and ramp-ups?
What does the path from pilot to full deployment look like?
System status · OperationaL
v 2026.5
Watch recent customer story



